BARGOED [Bargoed & Aber Bargoed]
12th January 2004

Bargoed station on the Cardiff - Rhymney line and marks the end of the double track section of the line from Cardiff. Originally built by the Rhymney Railway, the station is now operated by Arriva Trains Wales. CRS code: BGD

<-- Index | Showing 1-19 of 19 pictures | Index -->
General view of north end and signal box. 27th March 2003.
General view of north end and signal box. 27th March 2003.
A general view of Bargoed from the new platform. 26th April 2002.
A general view of Bargoed from the new platform. 26th April 2002.
Railtrack notice on the signal box door, following the style of a traditional GWR sign. 29th January 2005.
Railtrack notice on the signal box door, following the style of a traditional GWR sign. 29th January 2005.
General view looking north from the footbridge. 29th January 2005.
General view looking north from the footbridge. 29th January 2005.
The main building from above. 29th January 2005.
The main building from above. 29th January 2005.
The footbridge and lifts from above. 29th January 2005.
The footbridge and lifts from above. 29th January 2005.
The signal box. This building originally stood at Cymmer Afan and was moved to Bargoed in 1970 when the line was singled from here to Rhymney. 26th April 2002.
The signal box. This building originally stood at Cymmer Afan and was moved to Bargoed in 1970 when the line was singled from here to Rhymney. 26th April 2002.
General view of the replacement Rhymney-bound platform. 3rd April 2004.
General view of the replacement Rhymney-bound platform. 3rd April 2004.
Part of the main station building beneath the canopy with an old BR(W) bench. 3rd April 2004.
Part of the main station building beneath the canopy with an old BR(W) bench. 3rd April 2004.
The former goods shed, now in industrial use. 27th March 2003.
The former goods shed, now in industrial use. 27th March 2003.
The back of the new platform looking towards the road bridge. 27th March 2003.
The back of the new platform looking towards the road bridge. 27th March 2003.
New footbridge and lift. 27th March 2003.
New footbridge and lift. 27th March 2003.
The top of the footbridge with a lift tower and back station entrance in the background. 27th March 2003.
The top of the footbridge with a lift tower and back station entrance in the background. 27th March 2003.
Main building seen from the platform side. 27th March 2003.
Main building seen from the platform side. 27th March 2003.
Canopy support bracket. 27th March 2003.
Canopy support bracket. 27th March 2003.
Cast ironwork under the main canopy. 27th March 2003.
Cast ironwork under the main canopy. 27th March 2003.
The remains of a drinking fountain on the main building. 27th March 2003.
The remains of a drinking fountain on the main building. 27th March 2003.
Interior of booking hall. 27th March 2003.
Interior of booking hall. 27th March 2003.
The main building from the road side, 27th March 2003.
The main building from the road side, 27th March 2003.